Thoroughfare Planning, Design &
Construction in West Houston |
|
Project |
Limits |
Status—Listing of agency is not
necessarily suggestive of that agency’s commitment or interest |
|
Westpark Tollway Click for current
letting schedule of Section from Loop 610 to SH 6 |
SH 6 to
Grand Parkway |
HCTRA. Open Loop 610 to
SH 6
Ft. Bend: FM 1464 to Grand
Parkway completed |
|
West
Park Street |
SH 6
East to West of Eldridge |
City |
|
Westview |
1. BW 8
to Brittmoore
2. Brittmoore to Wilcrest
3. BW 8 to Gessner
4. Bingle to Campbell |
City,
TxDOT, Metro |
|
Clay |
1. SH 6
to Addicks Reservoir Dam
2. West of SH 6
3. Intersection
@ SH 6 |
1.
Completed-October 2003
2.County—Design
started west of Westgreen
3. County Funded Engineering Complete. Construction,
TxDOT in progress |
|
Park
Row |
1. SH 6
to Eldridge
2. Barker Cypress to Fry
3. Intersection Flares @ Fry East and West |
1. Public hearing pending.
2. Designed,
Pct 3 & Private Sector
3. TBD |
|
SH 6 |
1. Over
I-10
2. Grade Separation @ Memorial
3. Grade Separation @ Westheimer |
1. Part
of I-10—Funded by TxDOT & Selected for letting in 2005
2. TBD—Could provide connection between I10 and
West Park Toll Road
3. TBD—Could provide connection between I10 and
West Park Toll Road |
|
Kingsland |
Barker
Cypress to SH 6 (thru Barker Reservoir) |
|
|
Barker Cypress |
South of
I 10 to Westpark (thru Barker Reservoir) |
These projects through the Barker Reservoir where presented
to the Corps of Engineers by Harris County. The Corps has told
Harris County that they will not permit any roadways to be constructed
through the Reservoir. |
|
Briar Forest |
SH 6 to W of Barker Reservoir |
|
|
Grand
Parkway |
1.
Mainlanes South to Westpark 2. Mainlanes--I-10 to
US 290 |
1. TBD 2. Preparing
EIS. Possible toll road by Harris County/TxDOT |
|
Westheimer |
Grade Separation @ BW 8 |
Grade separation under design, working with
HCTRA/TxDOT |
|
West
Little York |
West
from SH 6 |
Pct
3—design and ROW OK east of Barker Cypress |
|
Gessner |
¼ mile N
& S of I-10 |
TxDOT to contract for construction to be
completed along with I-10 construction |
|
|
Hempstead Rd to Tanner |
Metro & City of Houston to construct 4 lane boulevard
section. Work to begin 1st Quarter 2005 |
|
Grisby |
West/East from SH 6 |
On City
MTP & requires ROW dedication.
Issues with intersection of redesigned I-10/SH 6 interchange. |
|
Greenhouse |
I-10
North to Saums |
To be constructed with I-10, TxDOT, Pct 3 & Private Sector |
|
Westgreen |
I-10 to
Franz |
To be constructed with I-10 |
|
Katy-Ft. Bend |
I-10 to
Franz |
TBD |
|
Franz/Saums |
Katy-Ft.
Bend to Barker Cypress |
TBD |
|
Morton |
Raintree
to Mason |
TBD |
|
Fry Road |
US 290 to FM 529 |
US 290 to Old Hempstead: Completion in of 2005
Old Hempstead to FM 529: RFP out May 2004; Construction
2004-2005; Completion Mid 2005 |
|
Brittmoore |
Clay Rd to I-10 |
COH: Construct 62' curb/gutter section. 2006 TIP for
engineering & construction |